Back to homepage

2025 maintenance schedule

Relax and Saunaria

Attraction Zone Closure date*

Floating pool

Relax 6.10 – 8.10

Calla shower

Saunaria 9.10 – 10.10

Magnesium vital pool

Relax 13.10 – 15.10

Lithium vital pool

Relax 15.10 – 17.10

Sulphur vital pool

Relax 20.10 – 22.10

Brine pool Dead Sea 4%

Relax 22.10 – 24.10

Brine pool Dead Sea 12%

Relax 27.10 – 29.10

Brine pool Dead Sea 18%

Relax 29.10 – 31.10

Vital pool in Saunaria zone

Saunaria 3.11 – 4.11

Calcium Vital Pool

Relax 5.11 – 7.11

Potassium Vital Pool

Relax 12.11 – 14.11

Vital pool in Saunaria zone

Saunaria 17.11 – 18.11

*Attractions closure dates may change.

Jamango

Attraction Zone Closure date*

Wave pool

Jamango 17.11 – 20.11

Slides

Jamango 24.11 – 27.11

Bubbling spring pool

Jamango 1.12 – 3.12

Mamba Adventure River

Jamango 8.12 – 12.12

Pool with bar

Jamango 10.12 – 12.12

Kids pool

Jamango 15.12 – 16.12

Baby Pool Jay

Jamango 15.12 – 16.12

Pirates Playground

Jamango 15.12 – 16.12

Surf Air

Jamango 17.12 – 19.12

*Attractions closure dates may change.